Custom Access System – EcoSciences

Custom rope access system allows a fast, non-disruptive fix to internal building feature panelling sited above public traffic areas Recently, the operators of the University of Queensland EcoSciences research facility in Dutton Park asked Height Dynamics to repair failing internal feature panelling. The key challenge was that a glass balustrade and high internal garden beds […]

And They Get Paid For That…?

Slope stabilisation at Cunninghams Gap above the Cunningham Highway on the A15 between Brisbane and Warwick has been going on literally since the road was officially opened in 1927. The road has often been closed. In December 2013 a boulder nine metres long and five metres high weighing over 300 tonnes landed on the road […]

Bridging the Gap

One of Brisbane’s iconic green precincts in a central city location provides locals and visitors a place to relax and enjoy the tranquility of a natural environment. The Roma Street Parklands boast expansive manicured lawns, waterfalls, themed gardens and bridged waterways. With the focus to maintain the parkland serenity, facility staff had the challenge to […]

Why Use Rope Access?

The low impact and versatility of a rope access team can mean that jobs normally requiring extensive scaffolding, road and pedestrian traffic control, expensive labour costs and disruption to tenants, can be done quickly and efficiently with limited disruption at a comparatively low cost. This was recently highlighted when a customer approached Height Dynamics to […]